Here are some photos of the trunking works done.
It was done a little differently from my initial discussion with the Aircon representative "NCR" from Natural Cool though. =(

Difference No. 1: ID "D" had reminded "NCR" many times during the discussion that he needs to leave a space for my roller blind above the window frame. Did "NCR" forget or...

Only minor patching needs to be done here.

Difference No. 2: How come this particular pipe isn't covered by trunking?

All the pipes go out from the right into the aircon ledge.

The water pipe will link back to the water outlet fitting (see that hole in the wall on the left) done by HDB in the Master Bedroom. The rest of the pipes... err... they will need some "grooming". :P

Trunking for bedroom 3 is pretty standard. Think most pple had it done this way.

Trunking for bedroom 2. I wonder why it is not aligned to the bottom of the beam. Hmm...

No comments:
Post a Comment