Tuesday, November 18, 2008

Reno Photo Set #4b (17 Nov 2008)

Part B – Aircon Trunking Works

Here are some photos of the trunking works done.
It was done a little differently from my initial discussion with the Aircon representative "NCR" from Natural Cool though. =(


Photobucket
Difference No. 1: ID "D" had reminded "NCR" many times during the discussion that he needs to leave a space for my roller blind above the window frame. Did "NCR" forget or...

Photobucket
Only minor patching needs to be done here.

Photobucket
Difference No. 2: How come this particular pipe isn't covered by trunking?

Photobucket
All the pipes go out from the right into the aircon ledge.

Photobucket
The water pipe will link back to the water outlet fitting (see that hole in the wall on the left) done by HDB in the Master Bedroom. The rest of the pipes... err... they will need some "grooming". :P

Photobucket
Trunking for bedroom 3 is pretty standard. Think most pple had it done this way.

Photobucket
Trunking for bedroom 2. I wonder why it is not aligned to the bottom of the beam. Hmm...

No comments: