The carpentry people came in today to do the following:
1) Drill a hole at TV console top for running cables through it.
2) Rectify "pigeon hole" in wardrobe.
3) Install the wardrobe sliding door. It was brought back to their factory to place it's laminate due to stain.
4) Rectify top potion of shoe cabinet which is slanting
5) Change the shoe shelves to "flat" version as the shoe cabinet doors cannot close after placing high heels shoes on the "sloping" version. =(
Installers from Jimmy Textiles came in at 12.30pm to install our day curtain track as well as the rollerblinds. Took slightly over an hour to fix up everything. For the rollerblind at the A/C ledge window, the installer told me no choice have to drill onto the aircon trunking. o_O; Hope don't affect the pipes inside. After these guys left, I noticed that they left some scratches on the wall and chip off a bit of paint. Sigh. Called my ID's assistant "C" to arrange for aircon pple to come down take a look.
Saturday, December 20, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment