Monday, December 1, 2008

Brief Update (27 Nov 2008)

9.30am - First group of my ID's workers came in. They are to work on plumbing and toilet accessories installation.

9.45am - The fan installer arrived with his assistant. I asked them to install the master bedroom fan first.

10.45am - Ceiling fan in the living room installed. So far so good.

11.00am - My ID's electrician group arrived. They are late by an hour. Gave them a quick brief before they start installing the lights.

11.30am - The toilet workers are done. Saw one of them holding a box and speaking to "C". She noticed me looking and told me that they broke one of my thumbler cups. Will get it replaced the next time they come back.

11.45am - My ID's floor tilers came in to fix up skirting in some areas.

12.00pm - The electrician are still installing the lights but i had to go so left my ID in charged.

3.49pm - "C" contacted me saying that the electrician cannot find the bulb to my dinning light. Checked with my light supplier to deliver again on Sat afternoon.

6.45pm - Reach the unit and did a check on the work done in the day. Noted that:
  1. the light above the entrance was wrongly positioned.

  2. One of the florescent tube of the kitchen light is not working.

  3. One of the downlight was wrongly installed at the room passageway so now we have two downlights at that position instead of one.

  4. Casement of electical wiring for water header not very nicely done.

  5. Safety clips for the kitchen and bedroom lights were discarded on the floor and not installed.


No comments: