1.24pm - My dad called me shortly after that saying the same thing.
2.02pm - My dad called again that the aircon installation was completed. The installer took the remote controls with them when they left.
6.45pm - Dropped by to check on the aircon installation as well as the entrance light.

Upon switching on the light, we notice that the lighting effect is affected by the defect. So die die must return and replace this light. But come to think of it, the lighting effect is nothing to shout about as well. hahaha.

The wrapping for our dining light was left dangling.

And there were pieces of glass swept nicely aside. I feared the worst.

The white acrylic casing for the bulb of my dining light was broken. I called "C" to tell her immediately. After her investigation, she said her workers were not the ones who broke it. However, she still offered to pay for the replacement as a gesture of goodwill.

Our Teka sink and tap has been delivered. Found them left in the household shelter.

Lastly, aircon were installed. I had reminded the installer to leave me the boxes. Might have use for them later. =P

7.30pm - Left the place and head to Sitex fair to look around for LCD TV promotion.

No comments:
Post a Comment